



Put the prepared raw materials into the mixer for mixing.The mixed rubber material is stored in a sealed bucket using a conveyor or crane for loose storage. The rubber material is then placed in a rolling mill for compression into sheets. Feed the sheet formed in the rolling mill into the pulverizer for pulverization.Mix the produced rubber powder and film release agent according to production requirements, and use a film release agent machine for molding processing.Inspection of finished products, including testing of dimensions, appearance, performance, etc.Through finished product inspection, check the prepared products, including size, color, performance, etc., to ensure compliance with requirements. The main testing items include hardness, tensile strength, load deformation, temperature change, adhesion, etc.The rubber powder film isolation agent prepared through the above process flow has reliable quality and can meet the needs of various types of customers.Put the prepared raw materials into the mixer for mixing.The mixed rubber material is stored in a sealed bucket using a conveyor or crane for loose storage. The rubber material is then placed in a rolling mill for compression into sheets. Feed the sheet formed in the rolling mill into the pulverizer for pulverization.Mix the produced rubber powder and film release agent according to production requirements, and use a film release agent machine for molding processing.Inspection of finished products, including testing of dimensions, appearance, performance, etc.Through finished product inspection, check the prepared products, including size, color, performance, etc., to ensure compliance with requirements. The main testing items include hardness, tensile strength, load deformation, temperature change, adhesion, etc.The rubber powder film isolation agent prepared through the above process flow has reliable quality and can meet the needs of various types of customers.

